Inspect the construction site and the surrounding envir […]

Inspect the construction site and the surrounding environment to ensure the feasibility of the project implementation.
There should be no shelter around the installation site to ensure that the solar battery can be properly lit. If it is difficult to ensure that there is no shelter throughout the day, try to ensure that there is no shelter between 9:00 am and 15:00 pm.
Installation site must be drained smoothly, if within 10 meters from the installation site there are rivers or puddles, such as low-lying water points, the lowest point of the foundation must be higher than the maximum water level within 50 years.
Installation site can not be laid underground cable, optical cable and other public facilities.
According to the construction design, determine the location of the pole and the light distance, such as changes in the scene should promptly negotiate with the owners to determine the solution.http://www.chinasolarlighting.com/